MK Secures the Arraya II Wiring Accessories Solution
MK Electric, part of the Honeywell Group, in association with KEC, are to supply the wiring accessory needs for the prestigious Array II Tower.
With work already well under way on a 56 stories tower being undertaken by sub-contractor Kharafi National – a stone’s throw away from the existing Salhia and Arraya shopping malls – the ‘MK’ Solution will comprise the very latest flat-plate screwless ‘Aspect’ range in a Brushed Stainless Steel (BSS) finish.
Discussions are also underway for KEC to supply a state-of-the-art cable management underfloor system suitable for marble flooring.
“Working alongside local specifying consultants Pan Arab Consulting Engineers, the MK win certainly represents another excellent feather in our cap,” noted KEC’s Rajan Peter. Indeed, this is one of series of projects that has favoured the MK Aspect in Brushed Stainless Steel finish including extensions to the Crowne Plaza and Holiday Inn hotels and numerous new Kuwait Finance House branches.
At 56 stories, Arraya II is slated to open in 2008 as one of the tallest buildings on the dynamic skyline of Kuwait City.
|